Ticketed performances at the Thomas Wolfe Auditorium will return March 16, General Manager Chris Corl told Asheville Watchdog. // Watchdog file photo by Starr Sariego

Today’s round of questions, my smart-aleck replies, and the real answers:

Question: What is the status of repairs, and more importantly, upgrades to the Thomas Wolfe Auditorium? I attended the town hall in August, and several proposals were presented. Six months have passed and there has been no news or attempts at fundraising. I recently attended a concert at the Peace Center in Greenville, South Carolina, and was impressed by the evidence of successful community fundraising to build and sustain the hall. Asheville needs an excellent performance space!

My answer: Sure, the Peace Center is nice and all, but you certainly don’t have the added excitement of a chunk of ceiling falling on your head or maybe getting electrocuted by your chair mid-concert. Where’s the fun in that?

Real answer: The Thomas Wolfe has been in dire straits just about the whole time I’ve lived here, and I’ve been here since 1995. As I noted in a column last summer it’s always déjà vu all over again when it comes to renovations to the auditorium, which has had problems with peeling paint, uncomfortable seats that occasionally catch on fire because of faulty aisle lighting, and a couple of bricks that have tumbled from the wall onto the stage.

Last year the auditorium had to close when the air conditioning died. At the time, General Manager Chris Corl did present several proposals to City Council, but the wheels aren’t in motion for those yet.

But Corl does have some good news.

“After a brief performance hiatus, we are proud to return to ticketed performances in the Thomas Wolfe Auditorium on Saturday, March 16, with a concert featuring Zach Williams with special guest Riley Clemmons,” Corl said via email. “During the venue’s temporary closure, we were able to conduct repairs to HVAC systems, sewer lines, and a majority of chipped plaster areas on the interior columns, (no ceiling plaster repairs.)”

They also used the down time to renovate the lower level restrooms and lobby space, and steam clean every seat in the room.

“Unfortunately, a new roof leak appeared just this week which resulted in damage to the plaster along two interior pillars,” Corl said. “The roof is being repaired this coming week, and plaster repair will be completed after the Zach Williams concert.”

As far as what the work done so far has cost, Corl said that’s a little tricky to nail down.

“Things like painting, steam cleaning, and most of the plaster repair we did in house, so it just absorbed into our general budget for staffing and such,” Corl said, adding that so far the auditorium has spent $236,779 with outside contractors. “A quick rough estimate of in-house costs of materials and labor is probably around $45,000 or so.”

Corl said organizers have  got “at least another $250,000 or so to go,” but the auditorium can reopen safely now. The plan is to finish the work this spring and early summer while accommodating events.

This boiler in the basement of the Thomas Wolfe Auditorium building was out of service last summer. The original auditorium, opened in 1940 with a flat floor that could accommodate a basketball court, was renovated in 1975 to its current configuration. // Watchdog file photo by John Boyle

Last August, during a tour of the facility, Corl told reporters he anticipated a drop in gross operating revenue for the 2023 fiscal year of $1.2 million, a 22 percent reduction from the previous fiscal year. On a positive note, that has not happened.

“We’re actually tracking to beat the budget this year,” Corl said “Our original budgeted revenues was just over $4.4 million; we’re tracking right now to come in around $4.7 million.”

Corl said the auditorium likely will bring City Council a budget amendment request sometime in April.

Corl offered these reasons why revenues did not drop.

1. Thomas Wolfe Auditorium events that were moved into the arena theater setup “actually performed quite well, with the vast majority selling more tickets than the maximum capacity of the Thomas Wolfe Auditorium, thus ultimately generating more revenue than originally planned,” Corl said.

The Wolfe Auditorium seats about 2,400 people. When the arena is set up as a theater it’s close to twice that. For a full arena show or event it seats 7,700.

2. “Not having the Thomas Wolfe Auditorium available for booking seems to have helped us fill the arena with more of the larger revenue events,” Corl said. “When we book a TWA event we still allow for bookings in the arena, but if we book a TWA show that we know is a sellout or close, we take the arena offline, except for smaller events that will not affect the TWA event.”

Water damage could be seen on the ceiling of the Thomas Wolfe Auditorium last summer. // Watchdog file photo by Starr Sariego

They do the same the other way around, but theater shows usually book three to six months further out than arena-sized shows.

“Therefore, weekends that we normally would have the TWA booked and only accepting smaller or non-compete arena shows, remained unbooked, allowing us a much greater amount of flexibility in the programming we dropped in the arena,” Corl said. “The mid- to large-size arena events generate exponentially more revenue than a mid- to sell-out sized TWA event.”

3. “Once we were able to determine a reopening date, local, regional and national event producers were eager to get back in the market with our room size,” Corl said. “Of the 16 remaining weekends this fiscal year, we have at least one event booked on eleven of those weekends.” The city’s fiscal year ends June 30.

4. Lastly, Corl said, “Our staff has been crushing it this year. Facing concerns over the budget, we pulled a good number of duties and tasks in house that we have historically outsourced. We also asked team members to review practices and find more efficiencies, look for new event opportunities and any opportunities to generate more revenue out of the same annual events.”

Chris Corl, director of Community & Regional Entertainment Facilities for the city of Asheville, offered several tentative renovations options for the Thomas Wolfe Auditorium, ranging from fixing existing problems and replacing seating to a complete overhaul. // Watchdog file photo by John Boyle

As far as movement on any of the renovation plans, there’s been none. Last year, Corl offered six plans, ranging from an acoustics-driven option that would cost between $130 million and $150 million, to a much more basic one to fix the infrastructure problems and update code compliance for $42 million to $52 million.

“Although we presented the City Council with six outlines of potential renovations to the Thomas Wolfe Auditorium, these were not formal proposals,” Corl said. “In the same meeting, the Council authorized our department to evaluate two specific potential options for renovation.”

You guessed it: There’s no movement yet on these proposals.

“Due to the lengthy process of designing, evaluating, and research needed, there has been no formal action to pursue either plan at this time,” Corl said. “I expect to bring more updates and options to City Council in the near future.”

For a schedule of upcoming events at the Thomas Wolfe or in the arena, visit HarrahsCherokeeCenterAsheville.com.

Stay tuned about future renovation plans. Oh, and keep an eye out for falling plaster!

The Wilma Dykeman Greenway in the River Arts District is designed to accommodate an array of users, including walkers, cyclists and roller bladers. The path also includes a designated cycling path. // Watchdog file photo by John Boyle

Question: At a recent Asheville City Council meeting, there was a consent agenda item to allow NCDOT to do preliminary engineering on the Wilma Dykeman Greenway extension. Will that mean that we’ll have to wait for the I-26 Connector project to be done before they will do this extension? The greenway now ends at White Duck Taco, but it’s supposed to go north to Broadway. What’s the status of this extension happening? It looks like the grant money goes to the city. Here’s the consent agenda item: “Resolution authorizing the City Manager to sign an amended grant agreement with the North Carolina Dept. of Transportation (NCDOT) for the North RADTIP (Wilma Dykeman) Greenway preliminary engineering allowing NCDOT to manage the preliminary engineering phase of the project; and that City Council accept the grant funds.”

My answer: I’m guessing the connector, greenway, and all this great stuff will wrap up sometime around the nation’s tricentennial. Hey, 52 years ought to be enough time.

Real answer: Gabriel Johnson, a project manager with the NCDOT’s Asheville office, Division 13, took this one on.

“NCDOT Division 13 has hired an engineering firm to begin design,” he said via email. “Our staff, City of Asheville staff, and the engineering firm will have a design kickoff meeting in the coming weeks.”

The construction schedule for the greenway extension “will be dependent upon coordination with the construction of the I-26 Connector Project.”

As I reported Feb. 22, the bids for the two main sections of the I-26 Connector project came in a couple hundred million dollars over the projected cost, so that might throw a wrench in an already long-delayed project.

“The city of Asheville and NCDOT will continue to coordinate on the design and ultimate construction of the greenway,” City of Asheville spokesperson Kim Miller said via email. “However, a schedule for construction has not yet been determined and will be coordinated with NCDOT’s I-26 Connector Project.”

“As more information about the I-26 construction timeline becomes available, more discussion will take place between the city and NCDOT regarding the construction timeline for the greenway,” Miller added.


Asheville Watchdog is a nonprofit news team producing stories that matter to Asheville and Buncombe County. Got a question? Send it to John Boyle at  jboyle@avlwatchdog.org or 828-337-0941. His Answer Man columns appear each Tuesday and Friday. The Watchdog’s reporting is made possible by donations from the community. To show your support for this vital public service go to avlwatchdog.org/donate.

9 replies on “Answer Man: Thomas Wolfe to reopen, and it’s not lost money? Will Wilma Dykeman Greenway extension be delayed by I-26 Connector project?”

  1. Chris Corl for Mayor! Just look at the job he’s done so far with the Thomas Wolfe and the Asheville Muni.

  2. The greenway project addressed in the article is the greenway to be located along the river’s edge from White Duck northward to Pearson Bridge. That is a project that the City has been pursuing diligently for several years, and it will be fabulous once built. Separately, NC DOT is to rebuild Riverside Drive from White Duck Taco up to the intersection with Broadway. That rebuild is part of the I-26 Connector project, and a design-build contract is to be let for it in the next few weeks. Included in the Riverside Drive rebuild are to be buffered bike lanes and a separated 10′ wide multi-use path. Those will be separate and in addition to the greenway planned along the river.
    These facilities will extend the bike-ped infrastructure now in the River Arts District up to the Woodfin town limit. There, they will connect to the 5-mile long Woodfin Greenway & Blueway project which is funded for construction beginning in 2025. Lots to look forward to!

    1. I agree it will be fabulous once it’s built, but when will that be? It sounds like construction will be “coordinated with the I26 connector project. How many years until any new Greenway north of white duck?

  3. Once again, the game of “Kick the Can” is being played with the Thomas Wolfe. Nothing seems to have been done to create handicapped access, the acoustics are still appalling, the seating is still substandard. It looks like the same old same old approach to maintaining it will remain in place – ignore until it becomes a crisis. As long as it is viewed as nothing but a cash cow, nothing will be done to upgrade its pathetic condition.

  4. The situation with TWA and city council makes me wonder yet again what our council does for the city and citizens. It seems they do nothing but green light hotel construction projects that no one but the TDA wants….

  5. Off subject: Why does North Carolina allow a lottery, casino gambling and, now, on-line sports betting, but not medical marijuana prescribed by licensed physicians?

  6. Thomas Wolfe Auditorium Open? I am confused. My impression last year was the AC could not be repaired and had to be replaced, plus a code compliant maintenance access to the units had to be constructed. I don’t remember the estimated cost, but I think it was far greater that what has been spent. So did the units get repaired or replaced? The old units had a very loud rumble during symphony performances.

  7. Thomas Wolfe and Harrah’s just need to be demolished completely. It’s a horrible venue. Nobody wants to go there and no bigger acts want to play there. The acoustics are mediocre at best. Asheville should be able to afford to build a new one. I’d buy a bond for that. Hell the hotels could chip in. If we can get a decent venue we could attract some bigger acts and the hotels would clean up. Win win as far as I see it.

Comments are closed.